News

What Happened at the Port of Ridgefield Waterfront Forum

June 18, 2026
Local News

Tense, Emotional, and Packed: What Went Down at the Waterfront Forum

About 150 residents filled — and overflowed — the upstairs conference room at 101 Mill Street on Wednesday night for the Port of Ridgefield's first open public forum on the waterfront development. It was charged, it was loud at times, and it was exactly the kind of conversation this community needed to have in the right room. Here's what happened, and what comes next.

Standing-room-only crowd at the Port of Ridgefield waterfront community meeting

The upstairs conference room at 101 Mill Street was packed well beyond capacity, with residents standing shoulder to shoulder and spilling toward the door.

If anyone needed convincing that Ridgefield cares deeply about its 41-acre waterfront, Wednesday night settled that question for good. The room was at capacity and then some — roughly 150 community members, with people standing along the walls and in the doorway. I was there for most of it, left about twenty minutes before the end, and the energy in that room was something I won't forget quickly.

The short version, for everyone who has been waiting to find out what happened: the Port showed up, the developer showed up, and the community made its feelings unmistakably clear. This was the launch of what the Port is calling a three-month community engagement process — not the end of the conversation, but the beginning of the formal one.

Who Was in the Room

This wasn't a skeleton crew sent to absorb complaints. The entire Port staff was present, along with top representatives from Palindrome Properties Group — including their Chief Operating Officer. The Port's Executive Director, Ethan Perry, was there. The full Port Commission was there. Facilitator Elizabeth Kennedy-Wong, a professional strategic engagement consultant, ran the room.

Port Executive Director Ethan Perry at the waterfront community meeting
Port Executive Director Ethan Perry opened the evening with a walk through the waterfront's history.
Facilitator Elizabeth Kennedy-Wong
Facilitator Elizabeth Kennedy-Wong kept the conversation structured and moving throughout the two-hour forum.

Kennedy-Wong was introduced specifically as someone there to hear what residents want — and her presence made a real difference. The meeting wasn't structured as a defensive Q&A with a panel taking shots. It was organized around listening. Every concern raised, every question, every piece of feedback was actively written down and documented in real time. That format matters.

The Port didn't send a spokesperson. They sent everyone — staff, commissioners, and the developer's leadership — to sit in the room and hear it directly from the community. — Meanwhile in Ridgefield observation, June 2026

How the Evening Was Structured

Ethan Perry opened by walking through the full history of the waterfront property — how we got here, what the site was before (a contaminated industrial facility requiring more than $90 million to clean up), and the decades of planning that led to the current conceptual proposal. The goal was to establish a shared foundation of facts before the room opened up.

Once the baseline layout was on screen, the Port was direct about their purpose: they were there to listen and learn. What does the community want this development to look like, feel like, and function like? The design, density, and flow are still on the table. Kennedy-Wong made that clear, as did the Port — and it was reinforced by the fact that both the full Port team and the Palindrome executives were in attendance specifically to hear from residents.

Facilitator managing an emotional moment during the community meeting

Kennedy-Wong navigated several emotionally charged moments with care, keeping the room focused on constructive input.

The Reality of the Room

I want to be honest about the atmosphere, because I think it matters for anyone trying to understand what happened. The crowd was overwhelmingly composed of people opposed to the current proposal — and they were not shy about it. There were moments that felt intense. The few community members who tried to speak in favor of the project, or even in favor of some middle ground, were met with immediate pushback from the audience.

I'll be direct: if I had been someone who supported the development, I'm not sure I would have felt comfortable speaking up. That's worth acknowledging. That said, the vast majority of the people in that room conducted themselves with passion but not with malice — it's a line, and most people stayed on the right side of it, even if it got close at moments. Emotions are understandable when people feel like something they love is at stake.

A resident reading a prepared statement at the microphone
Several residents came prepared with written statements, reading them carefully at the microphone.
Wendy McIntyre speaking at the community forum
Wendy McIntyre, who launched the Change.org petition that has gathered thousands of signatures, spoke during the public comment portion.

From my perspective as a neutral observer, the Port and their facilitator handled the environment exceptionally well. They didn't get defensive. They didn't push back. They listened, documented, and stayed the course — which, given the temperature in the room, was the right call.

What the Community Said

Across two hours of public comment and facilitated feedback, a clear picture of community priorities emerged. The concerns were consistent enough that they deserve to be documented clearly:

  • The Wildlife Refuge: Protecting the neighboring Ridgefield National Wildlife Refuge was the most emotionally resonant issue in the room. Residents want hard assurances that birds, migratory patterns, and habitat are not impacted by any new structures.
  • Scale and building height: Strong preference for low-profile development that fits the landscape rather than dominates it. Preserving view corridors and open character of the site was a recurring theme.
  • Traffic and infrastructure: Significant concern about how local roads absorb the impact of a new commercial and residential hub.
  • Housing density: Clear opposition to the proposed apartment component, particularly at the density currently in the conceptual plan.
  • Environmental review: Many speakers called explicitly for a formal Environmental Impact Study before any approvals move forward.

What the Numbers Confirm

The vocal turnout Wednesday closely mirrors results from an independent community poll conducted this month by local resident Connor Webb (Living in the PNW). With 221 responses — 77% from residents of five or more years — the data paints a consistent picture.

Ridgefield Waterfront Community Poll Highlights (June 2026)
  • Overall stance: 86% want minimal development (parks and open space only) or oppose major development entirely. Less than 2% support the current plan as proposed.
  • Housing: 88% do not want any permanent housing on the 41-acre site. 97% specifically oppose the proposed 256 apartment units.
  • Building height: 52% want no buildings at all; 40% would accept 1–2 stories. Only 8% support structures of three stories or more.
  • Environmental concern: 91% are very concerned about impacts to the Wildlife Refuge. 94% believe a formal Environmental Impact Study should be mandatory.
  • Top desired features: Walking trails and nature overlooks led with 179 votes, followed by kayak/canoe launch access at 151. Commercial elements ranked last.

Reading Between the Lines

Here's what I took away after two hours in that room: the Port is genuinely open to input on how this development looks, feels, and is laid out. The aesthetic and design elements — building scale, materials, view corridors, open space proportions, the park experience — are where the community holds real leverage. That's where the Port signaled they want to hear from people, and it's where focused, constructive input is most likely to shape the outcome.

What seemed less negotiable, reading between the lines, is whether development happens at all. The Port has invested over $90 million in cleanup of a formerly contaminated industrial site. They've been in planning for years. The redevelopment itself is largely the direction this is heading. For residents who want to make a tangible impact, the design conversation is the one worth showing up for — repeatedly, over the next three months.

Slide showing how the community can continue to engage with the Port of Ridgefield

The Port shared this overview of upcoming engagement opportunities — Wednesday's forum was explicitly framed as the launch of a three-month process, not a one-time event.

What Comes Next: A Three-Month Process

The Port was clear that Wednesday was not the end of the conversation — it was the start of a formal, structured engagement process running through the summer and into fall. There are multiple opportunities still open to participate, both in person and digitally.

Upcoming Engagement Opportunities
  • June 18: Main Street Community Meeting — 6–8 p.m. via Ridgefield Main Street. See ridgefieldmainstreet.com
  • June 22: Ridgefield Art Association Member Meeting — 5–6:30 p.m.
  • June 27: Tabling at the Ridgefield Farmers Market — 9 a.m.–noon. Drop by and ask questions.
  • July 7: American Legion Post #44 — 6–7 p.m.
  • July 13: Friends of the Ridgefield National Wildlife Refuge Board Meeting — 5–6:30 p.m.
  • July 18 & Aug. 8: Ridgefield Farmers Market tabling — 9 a.m.–noon.
  • Aug. 1: Paddle for Life / Ridgefield Day of Festivals — 9 a.m.–2 p.m.
  • Sept. 16: Golf Cart Tour — 4–6 p.m., starting at the Port Office, 101 Mill Street. RSVPs still open: [email protected]
  • Full schedule and project materials: portridgefield.org/ridgefield-waterfront

Make Your Voice Count — Right Now

Couldn't make it Wednesday, or didn't feel comfortable speaking up in a charged room? Both are completely valid. Here's how to get your input officially on record:

Submit Your Digital Feedback

Wednesday was loud and emotional and will probably be talked about in this community for a long time. What matters now is what happens next. The Port has committed to three months of structured engagement — which means three months of real opportunity to shape what gets built on Ridgefield's front porch. The survey, the tabling events, the September tour, the commission meetings — those are the next moves.

I was in the room for most of Wednesday night and will keep covering this as the process moves forward. If you attended and want to share your own takeaways — especially if you felt differently than what's reflected here — reach out through the contact page. Every perspective matters.
Shannon
Written by Shannon Visit website →
Meanwhile in Ridgefield
Submit your event
Free listings reviewed and published weekly. Featured spots available for events that want more reach.
Standard listing
Free calendar listing
Always free
Added to the events calendar and visible to everyone who visits. Great for community events, recurring happenings, and local gatherings.
Featured placement
Don't Miss listing
From $125
Highlighted on the calendar + promoted in our weekly newsletter. Best for festivals, grand openings, fundraisers, and ticketed events.
Email us about this